• Consultancy
  • Production
  • Projects
  • Training
  • Development
  • Technical Support
The St. Regis Amman

Projects

  • Youtube
  • Facebook
  • Linkedin
  • Twitter
  • Instagram
  • Whatsapp Lebanon
  • Whatsapp UAE
  • Autodesk Authorised Developer
  • Chaos Group is a worldwide leader in computer graphics
  • Sustainable Energy & Environmental Design Solutions - SEEDS® s.a.r.l

Projects

  • Project Name
    The St. Regis Amman
  • Client
    Al Maabar
  • Country
    Amman
  • Contractors
    Arabtec
  • Consultants
    Arabtech jardaneh
  • Category
    BIM Production & Clash Analysis
  • Project Type
    BIM Production
  • Project Duration
    From: Q3 2012,To: Q1 2013
  • Status
    Completed
  • Scope
    BIM production Based on the tender drawings received from our client for the purpose of Clash detection. The St. Regis Amman project, managed by Al Maabar in Amman from 2012 to 2013, focused on BIM Production and Clash Analysis. The initiative involved generating detailed Building Information Modeling (BIM) production based on tender drawings received from the client for the purpose of Clash Detection. Al Maabar utilized BIM methodologies to produce comprehensive digital models, facilitating clash analysis to identify and resolve conflicts within the design. This approach aimed to optimize coordination, enhance efficiency, and minimize errors during the construction phase of the St. Regis Amman development.
 

Case Studies