• Consultancy
  • Production
  • Projects
  • Training
  • Development
  • Technical Support
 DMCC BURJ 2020- PHASE1A

Projects

  • Youtube
  • Facebook
  • Linkedin
  • Twitter
  • Instagram
  • Whatsapp Lebanon
  • Whatsapp UAE
  • Autodesk Authorised Developer
  • Chaos Group is a worldwide leader in computer graphics
  • Sustainable Energy & Environmental Design Solutions - SEEDS® s.a.r.l

Projects

  • Project Name
    DMCC BURJ 2020- PHASE1A
  • Client
    MAST Piling & Foundation Contracting
  • Country
    UAE
  • Category
    BIM Production
  • Project Type
    BIM Production
  • Project Duration
    From: 2020
  • Scope
    BIM Modeling and Shop drawings MAST Piling & Foundation Contracting executed BIM Production for the DMCC Burj 2020 - Phase 1A project in the UAE in 2020, with a specific focus on BIM Modeling and Shop drawings. During the BIM Production phase, MAST Piling & Foundation Contracting developed detailed digital models and shop drawings using Building Information Modeling (BIM) methodologies. These models likely included essential information about the foundation systems, structural elements, and other components of the DMCC Burj 2020 - Phase 1A project. By providing BIM Modeling and Shop drawings services, MAST Piling & Foundation Contracting contributed to the successful planning, coordination, and execution of the project, ensuring accurate and efficient construction processes for the DMCC Burj 2020 - Phase 1A development in the UAE.
 

Case Studies